Tank Inspection — rough, backfill and final

One sheet for the whole permitted job. Fill in the rough, record the backfill once the rough has passed, then close out the final. Tap Print / Save as PDF for the job file. The draft stays on this phone if you lose signal.

1 The job

2 Rough inspection — before anything is covered

3 Backfill — after the rough passes

Nothing gets covered before the rough is signed off Set the rough result above to Passed (or Passed with corrections) before recording the backfill, and photograph the open trench first.

4 Final inspection and turn-on

Open trench, tracer wire, riser, tank set, regulator, gauge readings, the finished grade.

Nothing leaves this page except the photos, which go to the office when there is signal.

Tank Installation Inspection Record
Rough · Backfill · Final
Gas Solutions Plus
LP Gas License #LI100065
561-907-4301

Rough inspection Not inspected yet

    Backfill Trench still open

      Final inspection Not inspected yet

         Installer / qualifier — signature & date
         AHJ inspector — name & date
         Customer — signature & date

        Installed and tested by Gas Solutions Plus, Florida licensed LP gas contractor #LI100065. Underground piping is not to be covered until the rough inspection has been signed off. Keep this record with the permit file.